Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

项目状态 Updates

公共工程 Ian Projects

Hurricane Ian Projects

Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Charlotte Harbor CRA - Melbourne Street multi-use path 欧博体育官网 Image

Charlotte Harbor CRA - Melbourne Street multi-use path

Last Updated: 05/13/2024 Category: 人行道上 当前阶段: Design Development

Construct multi-use path on Melbourne Street from U.S. 41 to Harborview 路.

阅读更多

Charlotte Harbor CRA - Parmely Street road widening and sidewalk 欧博体育官网 Image

Charlotte Harbor CRA - Parmely Street road widening and sidewalk

Last Updated: 05/13/2024 Category: 巷道 当前阶段: Design Development

Reconstruct and widen Parmely Street from U.S. 41 to Bayshore 路.

Construct multi-use path on Parmely Street from U.S. 41 to Bayshore 路.

阅读更多

Sandhill Blvd Widening

Sandhill Blvd Widening

Last Updated: 05/13/2024 Category: 巷道 当前阶段: Planning and Project Approval

Sandhill Blvd Widening

阅读更多

Various Intersection Improvements 欧博体育官网 Image

Various Intersection Improvements

Last Updated: 05/13/2024 Category: 巷道 当前阶段: Design Development

The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.

阅读更多

Kings Highway Widening 欧博体育官网 Image

Kings Highway Widening

Last Updated: 05/13/2024 Category: 巷道 当前阶段: Design Development

Widen Kings Highway to a 4 lane divided roadway

阅读更多

吉尔特 & Blitman Waterway

吉尔特 & Blitman Waterway

Last Updated: 05/13/2024 Category: 巷道 当前阶段: Design Development

吉尔特 Blvd roadway reconstruction

阅读更多

NWPC Interior Canal Maintenance Dredge 欧博体育官网 Image

NWPC Interior Canal Maintenance Dredge

Last Updated: 05/10/2024 Category: 沿海 当前阶段: 建设

Northwest Port Charlotte waterway maintenance dredge design project. Design, plan, and permit a limited dredge project for the MSBU.

阅读更多

Lake Betty Park

Lake Betty Park

Last Updated: 05/10/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Park master plan for Lake Betty Park

Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, 行走路径, and an improved parking lot.

阅读更多

Myakka公园 欧博体育官网 Image

Myakka公园

Last Updated: 05/10/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Creation of a master plan through the park design process and phase 1 development.

阅读更多

Delivering Exceptional Service

问题? 问题?

欧博体育